Commercial Division: 

100 Federal Street
This project is a 64,000 SF, two phased project consisting of the conversion of existing retail space into 176 new parking provisions on the first sub-floor of the existing structure. The second phase consists of the construction of the Winter Garden (Glass Pavillion).

121 Seaport Boulevard
450,000 SF, seventeen-story, class-A office building targeting LEED Platinum certification. The tower celebrates the district’s creative innovative culture with the buildings bold elliptical form.

145 Broadway Core and Shell
Located in Cambridge, the new nineteen-story, 453,768 SF building, with a five-story garage underneath. Scheduled to begin in September 2017 and finish in October 2019.

AC Hotel by Marriott
This brand-new 97,000 SF, six-story hotel is the 5th building to be developed during the Ink Block Project. The hotel will feature 200 guest rooms and will feature a public art gallery visible from the street.

Blueprint Headquarters @ 45 Sidney Street
This project consists of a five-story lab renovation for the new corporate headquarters for Blueprint Medicine. State Electric will do a complete electrical, tel/data, and fire alarm system installation. The new office will be approximately 85,000 SF.

Boston College Recreation Center
New four-story, 240,000 SF recreation center that will include fitness facilities, swimming pools, multipurpose courts, jogging track, and locker rooms located at the corner of Campanella Way and St. Thomas More Road.

Boston Landing Residence
This is State Electric’s third project on Guest Street in Brighton, including the New Balance Headquarters and the Boston Bruins practice facility. When finished, the building will be approximately 311,000 square feet, including 295 residential units and approximately 16,000 square feet of retail space on the ground level.

Boston University Dahood Family Alumni Center
The 5,868 SF BU Castle is being renovated including a one-story addition to the Northside to expand the BU Pub. Scheduled to begin in September 2017 and finish in March of 2018.

Harvard Law School Bence Project
A new 20,238 SF four-story building. The project is to begin in November 2017 and finish in September 2018.

Harvard University HVAC Renewal
Two-Phase project that includes replacing the HVAC infrastructure for the entire Harvard University’s Biological Laboratories building as well as a 2,500 SF office fit-out on the fifth floor.

Northeastern University Student Apartments
New undergraduate dorm located on Burke Street in Roxbury, MA. This twenty-two story high dormitory when finished will be 318,000 SF and house approximately 800 students.

Pier 4 Office Core and Shell
The office tower when finished, will stand thirteen-story’s high and occupy 370,000 SF with floor-to-ceiling glass throughout. Inside the building will be a state-of-the-art fitness center and expansive rooftop garden terrace and 33,000 SF of retail opportunity on the lower levels

Pier 4 Phase 3 Condominium
Located on the iconic Anthony’s restaurant site with unobstructed views on three sides of the Financial District, Harbor, and Airport is the brand new 239,000 SF residential building. The 100+ ultra-luxury units with private outdoor spaces and top of the line finishes will be curved to maximize views of the downtown skyline.

Seaport Square B and C
Part of the Seaport Square Project Parcel B and C is a 22-story twin tower mixed-use facility with retail, entertainment, residential, office and research space.

Siena @ Ink Block
State Electric’s fifth project at South End’s newly developed Ink Block. The 115,000 SF residential apartment building contains 78 units.

Utility Division: 

Electric Ave. Substation
Located in Brighton, MA on Electric Ave is the new Eversource substation. The project scope includes the installation of 12-115kV GIS breakers with pipe type cable. Also installed is a solid dielectric 115kV cable termination.

Eversource Station 99
This is 1 of the 4 electrical contracts for the Eversource Seafood Way project. State is responsible for 2 of the 4 parts at Seafood Way. Part one is the GIS installation and part two is the above grade electrical package.

National Grid- Melrose
This project is replacing existing 23kV substation equipment with a new breaker and half Metal Clad Switchgear Power Center (MCSPC) and installing two metal clad capacitors banks.

Salem Harbor Power Plant
The 678 megawatt natural gas-fired energy plant is located on 23 acres adjacent to the old Salem Harbor Generating Station. The new plant will be providing electrical power to the New England area and support the introduction of renewable resources to the energy grid.

Sandy Pond Substation
Sandy Pond is an EPC project partnering with Black and Veatch Construction for the upgrade of the existing National Grid Sandy Pond Substation in Ayer, MA. This three year project consists of the installation of a new 23/115/345kV Control Building.

Seafood Way
Station 99, located in the Seaport District of South Boston, MA is a 6 bay, breaker-and-a-half (BAAH) GIS substation. There will be four 115kV incoming underground transmission supply lines, three 115/13.8kV power transformers, and a 13.8kV medium voltage shelter aisle metal clad switchgear.

Tufts CEP
This project is the construction of a new, efficient Central Energy Plant, at Tuft’s University. The plant will provide electricity, steam, hot water for heating, and chilled water for cooling to the upper campus and the new Science and Engineering Complex.

Service Division: 

Billerica Public Schools Service and Maintenance
State Electric is responsible for all electrical maintenance in 11 buildings. These Billerica Public School buildings include: 1 High School, 2 Middle Schools, 1 Hockey Rink, and 7 Elementary Schools.

Federal Reserve Bank Service and Maintenance
The service and maintenance scope includes the installation of (1) SD4B2-800A distribution panel. State Electric also will supply all labor and material to pull the necessary power and data cables, and install conduit raceway. All service and maintenance will be executed during normal business hours, Monday-Friday.

UMASS Lowell Service and Maintenance
This is a one year service contract for fire alarm installations and service maintenance for many of UMASS Lowell’s buildings.

 

State Electric: Your Experienced Partner for Electrical Construction Solutions